News & Events
KEDS invests in the village Serbica e Ulët in Prizren 15-05-2018

https://telegrafi.com/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit/
http://zeri.info/ekonomia/198270/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit/
https://gazetablic.com/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit/
http://www.kosovapress.com/sq/biznes/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit-161670/
http://prizrenpress.com/ekonomi/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit/
http://www.sovrani.info/keds-investon-ne-fshatin-serbice-e-ulet-te-prizrenit/

 

The Kosovan Company for Distribution and Supply with Electricity (KEDS), in the framework of the development plan, continues to invest in Prizren.
Its realizing its latest investments in the village of Lower Serbica.

In this village it is investing in new electric infrastructure. In the framework of the new project in the village of Lower Serbica in Prizren, the reconstruction of new tension low tension has been made and household connection have been made also a new transformer has been placed.

In this village, over 100 new poles have been placed, also braided cable. Where 88 families have benefited from this.

KEDS spokesperson, Viktor Buzhala, said that KEDS is working a lot to increase the quality of peoples lives through our projects, where until now 500 have been implemented.

"We are happy that we can increase the quality of people’s lives through our investments. The same case is also in Serbica of Prizren. So far, we have finished 500 projects. This is an indication that KEDS is a side to customers and citizens, so it is added value for the country", Buzhala said.

Residents of the village of Lower Serbica hope that after changing the electric network, the supply with electricity will improve.

Rexhep Gashi, a resident of the village shows that the electricity situation in this village has been very bad. ‘’The network was very weak. We didn’t have enough lights and let alone using other appliances’’, he says.
He said that with this investment he hopes that the state will improve. ‘’We thank KEDS for this investment and we hope it will not be the last one’’, he said.

The development plan of the distribution network is KEDS masterplan that foresees 300 million-euro investments in the distribution network of Kosovo until 2025. Through this master plan KEDS aims to renovate the electric network and to make it similar with the ones that are in the developed European countries. 

 

 

 

 

 

 

 


 
Keds Call Center
Online Services
Related News
Archive of News & Events
Planned network maintenance

Information about the outages due to planned works and maintenance

KEDS Projects

Find KEDS projects

Open positions

Find information for job vacancies

Kompania Kosovare për Distribuim dhe Furnizim me Energji elektrike SH.A
Kosovo Electricity Distribution and Supply Company J.S.C
Kosovsko Preduzece za Distribuciju i Snabdevanje Elektricnom Energijom D.D
Qendra e thirrjeve: 0800 791 00