News & Events
Two major electrical projects have been completed in Prishtina region 04-06-2018

https://www.lajme.mk/lajme/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines/
https://periskopi.com/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines/
https://gazetablic.com/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines/
http://www.kosovapress.com/sq/biznes/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines-163537/
http://zeri.info/ekonomia/199979/ne-prishtine-perfundojne-dy-projekte-te-rendesishme-elektrike/
http://lajmi.net/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines/
http://www.epokaere.com/dy-projekte-te-rendesishme-elektrike-kane-perfunduar-ne-rajonin-e-prishtines/

Around 10,000 customers from the village of Mazgitin Obiliq and Mati 1 neighborhood in Pristina have benefited from the implementation of KEDS projects aimed at improving the electricity supply for these locations.
In the village of Mazgitin Obiliq, KEDS has extended 35 kV cable, which is 2.016 meters long. This cable replaces the old cable that has been damaged. The importance of this investment is because through this cable are affected 6,000 customers supplied by the trafo station 5/10 kV Mazgiti. Consumers supplied by this connection now have a more stable electricity.
Even in the Mati1 neighborhood KEDS has extended 10 kV cable with 1,510 meters length that has enabled the ring to be realized between the two exits of Prishtina. This new cable has benefited 3,500 customers, who will now have better power supply.
KEDS spokesman Viktor Buzhala said that these two projects at these locations are of great importance to consumers. He said that KEDS is dedicated to responding to customer requirements and improving energy infrastructure.
"Such investments, which directly benefit thousands of customers, are a priority of KEDS. These two projects are of great importance to consumers and KEDS, especially when considering the features they characterize. Mazgiti is one of the main distributive centers for electricity, since a substantial portion of the population is supplied from that trafo station, while Mati is the fastest growing neighborhood in Kosovo. These are clear indicators that KEDS, the population development trends are responding to the development of energy infrastructure at the same time, "said Viktor Buzhala.
These two projects were carried out by KEDS teams in Kastriot and Pristina.
KEDS continues to invest and renew the power grid according to the Distribution Network Development Plan throughout the territory of Kosovo.

 


 
Keds Call Center
Online Services
Related News
Archive of News & Events
Planned network maintenance

Information about the outages due to planned works and maintenance

KEDS Projects

Find KEDS projects

Open positions

Find information for job vacancies

Kompania Kosovare për Distribuim dhe Furnizim me Energji elektrike SH.A
Kosovo Electricity Distribution and Supply Company J.S.C
Kosovsko Preduzece za Distribuciju i Snabdevanje Elektricnom Energijom D.D
Qendra e thirrjeve: 0800 791 00