The capacities presented on this map are indicative and serve exclusively for informational and guidance purposes in the preliminary planning phase. These data are based on the configuration and operational conditions of the network at the time of their preparation and may change depending on developments in the network.
These data do not constitute a guaranteed right to connection and do not imply an automatic refusal. Any request for connection of generating resources is subject to an individual technical assessment, in accordance with the Distribution Code and the requirements for safety, stability, and reliable operation of the network.
The final conditions for connection are determined on a case-by-case basis, following a detailed technical review of the specific condition of the substation and the relevant network.
The data presented are dated 19.09.2025.